Crazy! Karen keeps sending pictures. Construction projects are always fun to watch during the beginning stages because there is so much progress. I'll try to post a couple of updates each week.
The guys are strong! They are carrying the ridge poles for the Salty Fox.
The first two ridge poles on the Salty Fox are up!
Footers on bure number 3 are excavated.
The platform for bure number 8 is almost ready for footer work.
The guys getting a load of concrete ready. Note the students from the kindergarten in the left side of the photo watching the excitement.
The footers are being poured on bure number 2.